KNX installation — how to plan a system for a new home

By September 24, 2026November 4th, 2026No Comments6 min read
Modern two-storey home with full-height glazing and an outdoor pool

The best time to plan a KNX installation is before electrical work begins. This is when you can define the system’s functions, position keypads and sensors, plan lighting, shading and climate control, and provide the infrastructure they need.

In a residence, KNX should be part of the home’s overall technology design. We plan it alongside lighting, HVAC, security, audio and video, networking, and systems such as Crestron Home.

A KNX installation starts with the design

The most important KNX decisions come before the first cable is laid.

You need to decide which systems will be controlled, which functions should run automatically, and how the residents will use their home.

These decisions shape the system architecture, KNX bus, distribution boards, device locations and connections to other systems.

KNX distributes control across its devices, with the installation configured in ETS. It therefore does not need a single central controller on which the entire system depends.

  • First, we design how the home should work. Then we design the installation that makes it possible.

What should you decide before designing a KNX installation?

1

Lighting

Which circuits need switching, dimming or automatic control? Will the project include lighting scenes, DALI, decorative lighting and outdoor lighting?
2

Blinds and curtains

Blinds, curtains and pergolas should be included in the electrical design, with the appropriate power supplies and control connections.
3

Lighting

Plan which lighting groups need separate control. Check that the chosen luminaires, drivers and dimming interfaces work together before ordering equipment.
4

Heating and air conditioning

KNX can control room temperature, underfloor heating, air conditioning and other HVAC equipment.
5

Sensors

Presence, movement, temperature, light levels, air quality and weather conditions can provide the data needed for automation.
6

Keypads and interfaces

Decide early where keypads, touch panels and other controls are needed, and which functions each should provide.
7

Integrations

KNX can work with other building systems, including audio and video, security and Crestron Home. The KNX certified product catalogue includes devices for lighting, HVAC, shading, energy management, security and AV control.

The KNX distribution board: the installation's technical hub

In larger installations, many KNX actuators are housed in a distribution board.

These can include lighting actuators, dimmers, blind actuators, HVAC devices, bus power supplies, interfaces and communication equipment.

KNX distinguishes between sensors, actuators and system devices. Its certified product catalogue also includes power supplies, gateways and communication devices.

For a premium residence, the board needs spare capacity, a clear arrangement of functions, and access for maintenance and future expansion.

It is an essential part of the system design, so its size and layout should be planned from the outset.

How does KNX differ from conventional wiring?

With conventional wiring, a switch’s function is largely determined by its physical connection to a circuit.

In KNX, a keypad sends a message to the system, and its function is defined in the configuration.

The same control can operate one function or activate a scene involving several systems.

For example, an Away scene can turn off lights, lower selected blinds, adjust temperature settings and send commands to other integrated systems.

Separating the control layer from individual electrical circuits gives KNX considerable design flexibility.

KNX design and ETS configuration

The physical installation is only one part of a KNX system.

Devices must also be addressed, configured and linked to match the functional design.

ETS, or Engineering Tool Software, is used to design and configure KNX installations. It lets the integrator structure the project, define lines and group addresses, set device parameters and commission the system.

KNX documentation should therefore include electrical diagrams as well as the control logic, function structure and ETS project.

  • A successful KNX installation depends on functional design, configuration and commissioning as well as the equipment itself.

The installation design determines both the bus routing and the choice of actuators and controls. To understand what each component does, read:

The design stage is the right time to choose the system architecture. If you are considering both options, see:

When should you plan a KNX installation?

Ideally, before the electrical installation begins, while the interior and building services are still being designed.

This allows KNX to be coordinated with:

  • lighting,
  • blinds and curtains,
  • HVAC,
  • ventilation,
  • electrical wiring,
  • networking,
  • audio and video,
  • interior design.

Adding automation after the installation is complete can limit your options or require further work.

At AV Home, we begin the technology design as early as possible and coordinate it with the architect, interior designer and specialist contractors.

KNX installation security

A modern design must address secure communication and system access as well as everyday functions.

KNX Secure includes KNX IP Secure and KNX Data Secure, which protect IP communication and communication between devices respectively. KNX guidance also recommends secure remote access instead of exposing the installation directly to the internet.

If remote servicing is required, the access method should be part of the original design.

How does AV Home deliver a KNX installation?

1

Needs assessment

2

Functional design

3

Installation design

4

Installation coordination

5

Programming and commissioning

6

Testing, handover and support

We design KNX as part of the complete smart home system. The architecture, devices and integrations are chosen for the individual building and its residents.

During delivery, we coordinate the installation with other contractors, configure and test the system, and prepare it for everyday use and future servicing.